LDP Enhancement
(Before) Aerial view at Penchala Interchange connecting Mutiara Damansara/Damansara Perdana and Penchala Link on SPRINT highway.
(After) The interchange and the section from Persiaran Surian was upgraded under LDP 5 project with a new flyover from Bandar Utama towards Kepong in 2012 at the cost of RM100 mil.