LDP Enhancement

Original Image After
Modified Image Before

(Before) Aerial view of Puchong Jaya Interchange during the construction of LDP in 1997.

(After) The interchange plays a major role as a traffic dispersal point for Puchong residents. The interchange was completed in 1999 and was later upgraded in 2008 at a cost of RM 48 million.  Soon in 2014 it was upgraded under the LDP5 project at a cost of RM 74 million.


Back to LDP Enhancement